Group walk visits amphitheater
Wed, 08/09/2023 - 1:33pm
By:
Patty Svien
Wednesday, Aug. 2, the Walking Lake Pepin (WLP) walkers headed out to Old Frontenac to take a look at the outdoor chapel/amphitheater that was built in 2021 and 2022 at the Christ Episcopal Church.
Kerby Rigelman, who designed and built the chapel, spoke to the group sharing his story of why and how the outdoor chapel came to be.
