Letter: Highway plans look good, but how will they work?
Thu, 11/01/2018 - 12:15pm
By:
Jim Holst, Lake City
To the editor:
First of all the rendition of the new super two lane is very well done, and looks impressive on paper.
My personal opinion instead of the project would be:
• Reroute the Riverwalk halfway down the bank just above 100 Year Flood Level .
• Add another lane where the Riverwalk was.
• Use the added lane for space for turn lanes.
• Negotiate with the DOT for our own plans.
• Run a trial with lanes marked as they were super two lanes, to see if it works.
